Concrete lintels.

Friday, February 4, 2011

Since Portland cement was first mass produced towards the end of the nineteenth century it has been practical and economic to cast and use concrete lintels to support brickwork over openings.

Concrete is made from reasonably cheap materials, it can easily be moulded or cast when wet and when it hardens it has very good strength in resisting crushing and does not lose strength or otherwise deteriorate when exposed to the weather. The one desirable quality that concrete lacks, if it is to be used as a lintel, is tensile strength, that is strength to resist being pulled apart. To provide the necessary tensile strength to concrete steel reinforcement is east into concrete.

For a simple explanation for the need and placing of reinforcement in concrete lintels suppose that a piece of india rubber were used as a lintel. Under load any material supported at its ends will deflect, bend, under its own weight and loads that it supports. India rubber has very poor compressive and tensile strength so that under load it will bend very noticeably, as illustrated in Fig. 90. The top surface of the rubber becomes squeezed, indicating compression, and the lower surface stretched, indicating tension. A close examination of the india rubber shows that it is most squeezed at its top surface and progressively less to the centre, and conversely most stretched and progressively less up from its bottom surface to the centre of depth.

A concrete lintel will not bend so obviously as india rubber, but it will bend and its top surface will be compressed and its bottom surface stretched or in tension under load. Concrete is strong in resisting compression but weak in resisting tension, and to give the concrete lintel the strength required to resist the tension which is maximum at its lower surface, steel is added, because steel is strong in resisting tension, This is the reason why rods of steel are cast into the bottom of a concrete lintel when it is being moulded in its wet state.

Lengths of steel rod are cast into the bottom of concrete lintels to give them strength in resisting tensile or stretching forces. As the tension is greatest at the underside of the lintel it would seem sensible to cast the steel rods in the lowest surface. In fact the steel rods are cast in some 15mm or more above the bottom surface. 

The reason for this is that steel very soon rusts when exposed to air and if the steel rods were in the lower surface of the lintel they would rust, expand and rupture the concrete around them, and in time give way and the lintel might collapse. Also if a fire occurs in the building the steel rods would, if cast in the surface, expand and come away from the concrete and the lintel collapse. The rods are cast at least 15 mm up from the bottom of the lintel and 15 mm or more of concrete below them is called the concrete cover.

Fig. 90 Bending under load.

Concrete lintels Walls.

Wednesday, February 2, 2011

As an alternative to the use of steel lintels reinforced concrete lintels may be used to support the separate leaves over openings. This construction may be used where the appearance of a concrete lintel over openings in fairface brick is acceptable and where an outer leaf of brick or block is to be rendered to enhance protection against rain penetration or for appearance sake.

A range of precast reinforced concrete lintels is available to suit the widths of most standard door and window openings with adequate allowance for building in ends of lintels each side of openings. For use with fairface brickwork the lintel depth should match the depth of brick course heights to avoid untidy cutting of bricks around lintel ends.

These comparatively lightweight lintels are bedded on walling as support for outer and inner leaves.

The partial fill cavity insulation shown in Fig. 81 is carried down between the leaves of the wall to the head of the window or door frame. 

 Fig. 81 Concrete lintels.

Moisture movement - Concrete blocks.

Sunday, January 9, 2011

As water dries out from precast concrete blocks shrinkage that occurs, particularly with lightweight blocks, may cause serious cracking of plaster and rendering applied to the surface of a wall built with them. Obviously the wetter the blocks the more they will shrink. It is essential that these blocks be protected on building sites from saturation by rain both when they are stacked on site before use and whilst walls are being built. Clay bricks are small and suffer very little drying shrinkage and therefore do not need to be protected from saturation by rain. Only the edges of these blocks should be wetted to increase their adhesion to mortar when the blocks are being laid.

Lightweight aggregate concrete blocks primarily for internal non-loadbearing walls.

The thin blocks are solid and either square edged or with a tongue and groove in the short edges so that there is a mechanical bond between blocks to improve the stability of internal partitions. The
poor structural stability may be improved by the use of storey height door linings which are secured at floor and ceiling level.

Thin block internal partitions afford negligible acoustic insulation and poor support for fittings, such as book shelves secured to them.

The thicker blocks are either hollow or cellular to reduce weight and drying shrinkage.

Lightweight aggregate concrete blocks for general use in building.

The blocks are made of ordinary Portland cement and one of the following lightweight aggregates: granulated blast-furnace slag, foamed blast-furnace slag, expanded clay or shale, or well burned furnace clinker. The usual mix is I part cement to 6 or 8 of aggregate by volume. 


Of the four lightweight aggregates noted, well burned furnace clinker produces the cheapest block which is about two-thirds the weight of a similar dense aggregate concrete block and is a considerably better thermal insulator. Blocks made from foamed blast- furnace slag are about twice the price of those made from furnace clinker, but they are only half the weight of a similar dense aggregate block and have good thermal insulating properties. The furnace clinker blocks are used extensively for walls of houses and the foamed blast-furnace slag blocks for walls of large framed buildings because of their lightness in weight. 


These thin blocks, usually 60 or 75 mm thick, are made with the same lightweight aggregate as those in Class 2. These blocks are more expensive than dense aggregate blocks and are used principally for non-loadbearing partitions. These blocks are manufactured as solid, hollow or cellular depending largely on the thickness of the block.



Damp-proof membrane below site concrete.

Saturday, December 11, 2010

The obvious place to use a continuous damp-proof membrane is under the oversite concrete. The membrane is spread on a layer of comparatively dry concrete, clinker or ash which is spread and levelled over the hardcore as illustrated in Fig. 26. The edges of the membrane are turned up the face of external and internal walls ready for concrete laying so that it may unite and overlap the dpc in walls.

The membrane should be spread with some care to ensure that thin membranes are not punctured by sharp, upstanding particles in the blinding and that the edge upstands are kept in place as the concrete is laid.
The advantage of a damp-proof membrane under the site concrete is that it will be protected from damage during subsequent building operations. A disadvantage is that the membrane will delay the drying out of the oversite concrete that can only lose moisture by upwards evaporation to air.

Where underfioor heating is used the membrane should be under the concrete. 

Fig. 26 Below concrete damp-proof membrane.

Damp-Proof Membrane - Concrete.

Friday, December 10, 2010

Concrete is spread oversite as a solid base for floors and as a barrier to moisture rising from the ground.

Concrete is to some degree permeable to water and will absorb moisture from the ground; a damp oversite concrete slab will be cold and draw appreciable heat from rooms.

A requirement of the Building Regulations is that floors shall adequately resist the passage of moisture to the inside of the building. As concrete is permeable to moisture, it is generally necessary to use a damp-proof membrane under, in or on top of ground supported floor slabs as an effective barrier to moisture rising from the ground. The membrane should be continuous with the damp-proof course in walls, as a barrier to moisture rising between the edges of the concrete slab and walls.

A damp-proof membrane should be impermeable to water in either liquid or vapour form and be tough enough to withstand possible damage during the laying of screeds, concrete or floor finishes. The damp-proof membrane may be on top, sandwiched in or under the concrete slab.

Being impermeable to water the membrane will delay the drying out of wet concrete to ground if it is under the concrete, and of screeds to concrete if it is on top of the concrete.

Oversite Concrete (Concrete Oversite).

Thursday, December 9, 2010

On firm non-cohesive subsoils and rocks such as sand, gravel and sound rock beds which are near the surface, under vegetable top soil and are well drained or dry it is satisfactory to lay the concrete oversite directly on a bed of hardcore or broken rock rubble as there is little likelihood of any appreciable amount of moisture rising and being absorbed by the concrete. The concrete is laid within the confines of the external walls and load bearing internal walls and consolidated and levelled to a thickness of 100 mm ready for solid floor finishes or a raised ground floor.

On much of the low lying land that is most suitable for building, the subsoil such as clay retains moisture which will tend to rise through a hardcore bed to concrete oversite. The damp concrete will be cold underfoot and require additional energy from heating systems to maintain an equable indoor temperature. It is practice today to form a continuous layer of some material that is impervious to water under, in or over the concrete oversite as a damp-proof membrane on the site of all inhabited buildings where there is a likelihood of moisture rising to the concrete.

Ready-mixed concrete.

The very many ready-mixed concrete plants in the United Kingdom are able to supply to all but the most isolated building sites. These plants prepare carefully controlled concrete mixes which are delivered to site by lorries on which the concrete is churned to delay setting. 

Because of the convenience and the close control of these mixes, much of the concrete used in building today is provided by ready-mixed suppliers. To order ready-mixed concrete it is only necessary to specify the prescribed mix, for example C lOP, the cement, type and size of aggregate and workability, that is medium or high workability, depending on the ease with which the concrete can be placed and compacted.

Concrete mixes.

 British Standard 5328: Specifying concrete, including ready-mixed concrete, gives a range of mixes. One range of concrete mixes in the Standard, ordinary prescribed mixes, is suited to general building work such as foundations and floors. These prescribed mixes should be used in place of the traditional nominal volume mixes such as 1:3:6 cement, fine and coarse aggregate by volume, that have been used in the past. The prescribed mixes, specified by dry weight of aggregate, used with 100 kg of cement, provide a more accurate method of measuring the proportion of cement to aggregate and as they are measured against the dry weight of aggregate, allow for close control of the water content and therefore the strength of the concrete.

The prescribed mixes are designated by letters and numbers as C7.5P, C1OP, C15P, C2OP, C25P and C3OP. The letter C stands for ‘compressive’, the letter P for ‘prescribed’ and the number indicates the 28-day characteristic cube crushing strength in newtons per square millimetre (N/mm2) which the concrete is expected to attain. The prescribed mix specifies the proportions of the mix to give an indication of the strength of the concrete sufficient for most building purposes, other than designed reinforced concrete work.
Table 1 equates the old nominal volumetric mixes of cement and aggregate with the prescribed mixes and indicates uses for these mixes.

 Table 1. Concrete Mixes.

Proportioning materials.

The materials used for mass concrete for foundations were often measured out by volume, the amount of sand and coarse aggregate being measured in wooden boxes constructed for the purpose. This is a crude method of measuring the materials because it is laborious to have to fill boxes and then empty them into mixers and no account is taken of the amount of water in the aggregate. The amount of water in aggregate affects the finished concrete in two ways: (a) if the aggregate is very wet the mix of concrete may be too weak, have an incorrect ratio of water to cement and not develop full strength and, (b) damp sand occupies a greater volume than dry. This increase in volume of wet sand is termed bulking.

The more accurate method of proportioning the materials for concrete is to measure them by weight. The materials used in reinforced concrete are commonly weighed and mixed in large concrete mixers. It is not economical for builders to employ expensive concrete mixing machinery for small buildings and the concrete for foundations, floors and lintels is usually delivered to site ready mixed, except for small batches that are mixed by hand or in a portable petrol driven mixer. The materials are measured out by volume and providing the concrete is thoroughly mixed, is not too wet and is properly consolidated the finished concrete is quite satisfactory.

Water-cement ratio.

Wednesday, December 8, 2010

The materials used for making concrete are mixed with water for two reasons. Firstly to cause the reaction between cement and water which results in the cement acting as a binding agent and secondly to make the materials of concrete sufficiently plastic to be placed in position. The ratio of water to cement used in concrete affects its ultimate strength, and a certain water—cement ratio produces the best concrete. If too little water is used the concrete is so stiff that it cannot be compacted and if too much water is used the concrete does not develop full strength.

The amount of water required to make concrete sufficiently plastic depends on the position in which the concrete is to be placed. The extreme examples of this are concrete for large foundations, which can be mixed with comparatively little water and yet be consolidated, and concrete to be placed inside formwork for narrow reinforced concrete beams where the concrete has to be comparatively wet to be placed. In the first example, as little water is used, the proportion of cement to aggregate can be as low as say 1 part of cement to 9 of aggregate and in the second, as more water has to he used, the proportion of cement to aggregate has to be as high as say I part of cement to 4 of aggregate. As cement is expensive compared with aggregate it is usual to use as little water and therefore cement as the necessary plasticity of the concrete will allow.

Cement.

The cement most used is ordinary Portland cement. It is manufactured by heating a mixture of finely powdered clay and limestone with water to a temperature of about 1200°C, at which the lime and clay fuse to form a clinker. This clinker is ground with the addition of a little gypsum to a fine powder of cement. Cement powder reacts with water and its composition gradually changes and the particles of cement bind together and adhere strongly to materials with which they are mixed. Cement hardens gradually after it is mixed with water.

Some thirty minutes to an hour after mixing with water the cement is no longer plastic and it is said that the initial set has occurred. About 10 hours after mixing with water, the cement has solidified and it increasingly hardens until some 7 days after mixing with water when it is a dense solid mass.

Fine aggregate and coarse aggregate.

Fine aggregate is natural sand which has been washed and sieved to remove particles larger than 5 mm and coarse aggregate is gravel which has been crushed, washed and sieved so that the particles vary from 5 up to 50 mm in size. The fine and coarse aggregate are delivered separately. Because they have to be sieved, a prepared mixture of fine and coarse aggregate is more expensive than natural all-in aggregate. The reason for using a mixture of fine and coarse aggregate is that by combining them in the correct proportions, a concrete with very few voids or spaces in it can be made and this reduces the quantity of comparatively expensive cement required to produce a strong concrete.

All-in aggregate Ballast.

All-in aggregate (ballast) is one of the cheapest materials that can be used for making concrete and is used for mass concrete work, such as large open foundations. The proportion of fine to coarse particles in an all-in aggregate cannot be varied and the proportion may vary from batch to batch so that it is not possible to control the mix and therefore the strength of concrete made with all-in aggregate. Accepted practice today is to make concrete for building from a separate mix of fine and coarse aggregate which is produced from ballast by washing, sieving and separating the fine from the coarse aggregate.

Aggregate.

The materials commonly used as the aggregate for concrete are sand and gravel. The grains of natural sand and particles of gravel are very hard and insoluble in water and can be economically dredged or dug from pits and rivers. The material dug from many pits and river beds Consists of a mixture of sand and particles of gravel and is called ‘ballast’ or ‘all-in aggregate’. The name ballast derives from the use of this material to load empty ships and barges. The term ‘all-in aggregate’ is used to describe the natural mixture of fine grains of sand and larger coarse particles of gravel.

Concrete.

Tuesday, December 7, 2010

Concrete is the name given to a mixture of particles of stone bound together with cement. Because the major part of concrete is of particles of broken stones and sand, it is termed the aggregate. The material which binds the aggregate is cement and this is described as the matrix.



Oversite concrete - Portland Cement.

When Portland cement was first continuously produced, towards the end of the nineteenth century, it became practical to cover the site of buildings with a layer of concrete as a solid level base for floors and as a barrier to rising damp. From the early part of the twentieth century it became accepted practice to cover the site of buildings with a layer of concrete some 100mm thick, the concrete oversite or oversite concrete. At the time, many ground floors of houses were formed as raised timber floors on oversite concrete with the space below the floor ventilated against stagnant damp air.

With the shortage of timber that followed the Second World War, the raised timber ground floor was abandoned and the majority of ground floors were formed as solid, ground supported floors with the floor finish laid on the concrete oversite. At the time it was accepted practice to form a continuous horizontal damp-proof course, some 150 mm above ground level, in all walls with foundations in the ground.

With the removal of vegetable top soil the level of the soil inside the building would be from 100 to 300mm below the level of the ground outside. If a layer of concrete were then laid oversite its finished level would be up to 200 mm below outside ground level and up to 350 mm below the horizontal dpc in walls. There would then be considerable likelihood of moisture rising through the foundation walls, to make the inside walls below the dpc damp, as illustrated in Fig. 24.

It would, of course, be possible to make the concrete oversite up to 450 mm thick so that its top surface was level with the dpc and so prevent damp rising into the building. But this would be unnecessarily expensive. Instead, a layer of what is known as hardcore is spread oversite, of sufficient thickness to raise the level of the top of the concrete oversite to that of the dpc in walls. The purpose of the hardcore is primarily to raise the level of the concrete oversite for solid, ground supported floors.

The layer of concrete oversite will serve as a reasonably effective barrier to damp rising from the ground by absorbing some moisture from below. The moisture retained in the concrete will tend to make solid floor finishes cold underfoot and may adversely affect timber floor finishes. During the second half of the twentieth century it became accepted practice to form a waterproof membrane under, in or over the oversite concrete as a barrier to rising damp, against the cold underfoot feel of solid floors and to protect floor finishes. Having accepted the use of a damp-proof membrane it was then logical to unite this barrier to damp, to the damp-proof course in walls, by forming them at the same level or by running a vertical dpc up from the lower membrane to unite with the dpc in walls.

Fig. 24 Diagram to illustrate the need for hardcore.



Even with the damp-proof membrane there is some appreciable transfer of heat from heated buildings through the concrete and hardcore to the cold ground below. In Approved Document L to the Building Regulations is the inclusion of provision for insulation to ground floors for the conservation of fuel and power. The requirement can be met by a layer of insulating material under the site concrete, under a floor screed or under boarded or sheet floor finishes to provide a maximum U value of 0.45 W/m2K for the floor.

The requirement to the Building Regulations for the resistance of the passage of moisture to the inside of the building through floors is met if the ground is covered with dense concrete laid on a hardcore bed and a damp-proof membrane. The concrete should be at least 100 mm thick and composed of 50 kg of cement to not more than 0.11 m3 of fine aggregate and 0.16 m3 of coarse aggregate of BS 5328 mix ST2. The hardcore bed should be of broken brick or similar inert material, free from materials including water soluble sulphates in quantities which could damage the concrete. A damp-proof membrane, above or below the concrete, should ideally be continuous with the dpc in the walls.

It is practice on building sites to first build external and internal load bearing walls from the concrete foundation up to the level of the dpc, above ground, in walls. The hardcore bed and the oversite concrete are then spread and levelled within the external walls.

If the hardcore is spread over the area of the ground floor and into excavations for foundations and soft pockets of ground that have been removed and the hardcore is thoroughly consolidated by ramming, there should be very little consolidation settlement of the concrete ground supported floor slab inside walls. Where a floor slab has suffered settlement cracking, it has been due to an inadequate hardcore bed, poor filling of excavation for trenches or ground movement due to moisture changes. It has been suggested that the floor slab be cast into walls for edge support. This dubious practice, which required edge formwork support of slabs at cavities, will have the effect of promoting cracking of the slab, that may be caused by any slight consolidation settlement. Where appreciable settlement is anticipated it is best to reinforce the slab and build it into walls as a suspended reinforced concrete slab.

 
 
 